Gen 2 · Precision curing United States / USD
ShopDashboard loginOrdersCart 0

Kevin D.: curing experience

Results at a glance: Multi-room Michigan operation, 4 Cure Pucks, 10–12 day cure. Reported: daily on-site curing visits eliminated, about $250 of labour saved per cure cycle.

Reported by Kevin D.

Kevin D. reported: a 10-12 day Cure Puck cycle improved aroma and consistency while eliminating daily cure visits and saving about $250 in labour per cycle.

Kevin D. case-study artwork

Kevin D. · Read online and open the original PDF

From the case study

The following passages are from the original customer case study.

The problem

Kevin's operation was curing manually with no real measurements, just two to three weeks and out the door. Staff turnover and location changes meant new people had to learn the process from scratch, and things were getting dropped. As the Michigan market shifted, he needed a more exacting, consistent, and less labour-intensive approach to produce top-shelf flower that could compete.

The solution

Cure Puck provided the consistency and automation Kevin's multi-room operation needed. Four Gen 2 units replaced the manual curing process, delivering repeatable results within a controlled 10-12 day cure cycle. Remote monitoring consolidated post-harvest oversight to one person, eliminating the need for daily on-site visits.

Reported by the customer from an earlier product generation. Results depend on drying, room conditions and process. Burping labour only; routine batch checks continue.