From the case study
The following passages are from the original customer case study.
The problem
Kevin's operation was curing manually with no real measurements, just two to three weeks and out the door. Staff turnover and location changes meant new people had to learn the process from scratch, and things were getting dropped. As the Michigan market shifted, he needed a more exacting, consistent, and less labour-intensive approach to produce top-shelf flower that could compete.
The solution
Cure Puck provided the consistency and automation Kevin's multi-room operation needed. Four Gen 2 units replaced the manual curing process, delivering repeatable results within a controlled 10-12 day cure cycle. Remote monitoring consolidated post-harvest oversight to one person, eliminating the need for daily on-site visits.
Reported by the customer from an earlier product generation. Results depend on drying, room conditions and process. Burping labour only; routine batch checks continue.
